Journal of Mathematical Problems, Equations and Statistics
  • Printed Journal
  • Refereed Journal
  • Peer Reviewed Journal

P-ISSN: 2709-9393, E-ISSN: 2709-9407
Peer Reviewed Journal

2025, Vol. 6, Issue 1, Part D


Profit and average period of the repairman analysis of four unit system using regenerative point graphical technique


Author(s): Purnima

Abstract: This paper discusses Availability Analysis of Four Unit classification by Preventive Maintenance in addition to Degradation. In One Unit, and a single repairman who is also in 24x7 available by the RPGT. In this study, we have considered a four units in which there is a main unit in which components are so arranged that it can work in reduced and further reduced state after degradation also other units A, B & C are occupied either at full ability or in failed state-II is considered also the repair rates are perfect. In the unit or subsystem ‘D’, it can apply two types of maintenance as one is perfect maintenance. Various path probabilities mean sojourn time is discuss by drawing tables for greater than ever failure/repair rates and graphs.

Pages: 345-349 | Views: 35 | Downloads: 20

Download Full Article: Click Here

Journal of Mathematical Problems, Equations and Statistics
How to cite this article:
Purnima. Profit and average period of the repairman analysis of four unit system using regenerative point graphical technique. Journal of Mathematical Problems, Equations and Statistics. 2025; 6(1): 345-349.
Journal of Mathematical Problems, Equations and Statistics
Call for book chapter